Friday, May 3, 2013

CRJ-200 Tail Dock System

Application: CRJ-200 Tail Docking system utilized for heavy maintenance and overhaul of the CRJ-200 airframe. The unit incorporated a jib crane for removal of the horizontal stabilizer. The structure is made up of a port and starboard side, allowing 3-4 employees to manually move the system into position one half at a time.


CRJ-200 Tail Dock System Features:



  • All steel construction

  • Skydrol Resistant Powder coated finish

  • Aluminum slide plates at vertical stabilizer for fit up

  • Tow bars for moving the units far distances

  • Screw jacks to lock platform in place during use

  • Crown face high capacity casters

  • Rubber bumper material at potential contact points

  • 2,000 lb capacity pendant operated jib crane

  • 16 person capacity (8 person per level)

  • Storage shelves for parts storage during MRO work

  • Traction tread walking/working surfaces

  • 50º forward descent staircases on each half


Industrial Manlifts is YOUR total aerial access solution provider. We can customize any aerial access solution for any project. Operators standing by, (888) 730-8377. 


CRJ-200 Tail Dock System

No comments:

Post a Comment